Hire a designer if necessary: ​​Depending on the size of the installation, it may be necessary to draw up a technical project. In the case of individual installations larger than 70kW or common installations larger than 2000kW, a project must be drawn up by an engineering professional who will also direct the execution of the work, certifying at the end of the work that the installation complies with the current reference regulations.
Hire the most suitable rate: companies are divided according to the power and characteristics of the supply. Depending on the type and installation, it will be convenient to compare the different possibilities to find the one that best suits the consumption and needs of our installation.
Make sure you have the right ventilation grilles: Check that the premises where natural gas equipment, boilers, stoves or other installations are located have the necessary ventilation grilles. As it is a gas that is lighter than air, these ventilation areas must be located in the upper areas. It is essential to keep them in good condition and not cover vp financial email lists them under any circumstances.
Checking the receiving installation: The legislation requires that the gas receiving installation be inspected every five years. This must be carried out by a duly accredited company or by the distribution company. Do not confuse this with the inspection of the thermal installation or the boiler, as they are different installations.

How to carry out the installation of natural gas
Once all the checks we have mentioned above have been carried out to ensure that the installation is going to be viable, it is time to start with the installation.

First of all, if when carrying out the checks to see the availability of natural gas in your property you see that there is none, we have to start with this point.

To begin with this installation you must contact an installation company, which will be responsible for making a connection and a community installation in the case that we are talking about a property that did not have gas previously. Once the community installation has been carried out, the individual installation would be carried out to ensure that natural gas reaches the home. This installation can be carried out either by the natural gas company or by a certified installation company.

Image


If we go to the other case, that is, if this previous installation already exists, on your part you will only have to proceed to make a change of ownership.

Once everything is installed, and your name is in, the next step would be to obtain the natural gas installation certificate to prove that its use is viable. It must always be presented in three cases: in the case of new housing, when modifications or reforms are made that affect the installation or in houses where the gas service was disconnected for a long time. As you can see, there are three cases in which it is possible to find more faults in the installation, hence its presentation is mandatory. You can request the certificate from the installation company or the supply company.